Updated October 2026 by UpgradeWorth Editorial. Bid analysis, not an appraisal of your contractor. How we estimate costs
For homeowners holding a written roofing bid. In six steps it sets what you asked for against what the paper actually prices, names every line the bid leaves unstated, and tells you which dimensions have to be settled before two totals can be compared at all. It does not tell you whether the price is fair, and it cannot assess your roof.
Have the written bid in front of you. Everything below is read straight off the paperwork. Where a line is not on the paper, choose Not stated or leave it unticked: each gap becomes a question for the contractor rather than a guess by us.
It reads one bid at a time. It does not rate the contractor, it does not name a fair price, it does not cover insurance or storm-damage claims, and it cannot tell you whether your roof needs replacing. Only somebody who gets on the roof can do that.
Step 1 of 6 · The job you asked for
The job you asked for
Start with what you requested. The next steps read the bid.
Area and removal
Read these off the paper. Do not fill in what you assume is included.
The deck and the hidden layers
The visible roof and ventilation
Warranty, permits and terms
Tick only what the bid actually states in writing.
What this bid describes
Each line sets what you asked for against what the paper prices. Same means the bid prices what you asked for. Different means it prices something else. Unknown means the paper does not say. Not comparable means this dimension has to be settled before this total can be set against any other bid.
What the bid does not state
Questions to send back before you sign
Nothing is stored. This runs in your browser and resets when you close the page.
Roof quote scope-gap checklist
Before you compare two bids, scan the paper for these lines on your own. If any of the words below aren’t there in writing, treat the line as Unknown and send it back as a question. The tool above walks the same framework; this is the shorter paper copy for a quick read.
Components (what goes on the roof). Each line is a product with a brand and a tier. “Included in the price” is not a specification.
- Field material. Manufacturer and product line, not only “architectural” or a warranty length. One shingle name can cover several lines at different prices — the CertainTeed Landmark Pro quote decoder is a worked example of the lines a brand-only mention leaves open.
- Underlayment. Felt or synthetic, with the product named. “Per code” is not a product.
- Ice and water barrier. The locations named — eaves, valleys, penetrations — not only a quantity. See the ice and water shield decoder for the coverage lines that stop two bids from being comparable.
- Flashing. All new, or partly reused, with the pieces listed by name: valley, step, chimney, skylight, drip edge. “Seal as needed” is not a flashing specification.
- Hip and ridge cap, and ventilation. A manufactured cap or field shingles cut on site; exhaust and intake addressed, not exhaust alone.
Labor (what the crew does to install them). Most crew work sits inside the per-square number. Ask it to be named anyway, so a change on install day doesn’t become an argument.
- Removal scope. Full tear-off or overlay, and how many layers come off. This is usually the single largest swing in a roofing total.
- Disposal. Dumpster, haul-away and magnetic nail sweep stated as included, not assumed.
- Deck inspection after tear-off. Written into the bid, with what happens if problems are found.
- Nailing pattern or wind install method. Stated, because it often gates the manufacturer’s wind warranty tier.
- Permit responsibility. Who pulls it and who pays.
Change-of-scope add-ons (conditional work, priced before anyone sees under the old roof). These are the lines that turn a fixed bid into an open one. Agree the unit price in writing before the roof comes off.
- Deck replacement. A number of sheets included and a stated price per extra sheet. “Replaced as needed” with no quantity and no rate is the highest-risk phrase on a roofing bid — the roof decking replacement cost page covers the per-sheet figure and the wording to request.
- Rotted or missing flashing beyond the stated pieces. A written rate per piece, not “as needed.”
- Low-slope or flat sections. Addressed with a membrane, not shingles. A bid that ignores a flat section is not a whole-roof bid.
- Skylights, chimneys and penetrations. Replaced, reflashed or explicitly excluded. Silence on any of them becomes a change order on install day.
- Change-order procedure. Written approval required before extra work proceeds, with the signed-off dollar figure attached.
A line marked Unknown is not a mark against the contractor — it is a question your bid hasn’t answered yet. Ask it in writing and keep the reply with the bid.
Missing and conditional line items, a short FAQ
My bid says “decking replaced as needed” with no number. Is that normal?
It is common, and it is the highest-risk phrasing on a roofing bid. Nobody can see the deck until the old roof is off, which is the honest part. The unresolved part is price: no included quantity, no rate per extra sheet, no ceiling. Ask for a specific number of sheets included in the base price and a stated dollar figure per additional sheet, in writing, before you sign. Our roof decking page covers the typical per-sheet figures and the wording to request.
The bid names a shingle brand but no product line. Does that matter?
Yes. One manufacturer sells several asphalt lines at different prices under one name, and the warranty tiers differ between them. “Architectural shingles” or “30-year warranty” is not a product. Ask for the full manufacturer and product line in writing, and whether the accessories — starter, hip and ridge, underlayment, ventilation — are from the same system; that is often what unlocks the upgraded warranty tier.
The bid says “flashing sealed as needed.” Isn’t that the same as new flashing?
No. Most roofs leak at the flashings rather than in the open field, and sealant is a short-life fix on a long-life roof. Ask for each flashing piece to be named — valley, step, chimney, skylight, drip edge — with “new” or “reused” written beside it.
Ice and water shield is listed “per code.” What should I ask?
Local code sets a minimum, which varies by jurisdiction and is often read conservatively. Ask which specific locations are covered: eaves, valleys, penetrations, and any low-slope sections, and roughly how much. The ice and water shield decoder walks through where coverage usually stops being comparable between two bids.
The bid lists a long warranty but no tier name. Does that mean I’m covered?
A number of years is not a tier. Manufacturer warranties come as named programs with different coverage, different registration windows and different accessory requirements. Ask which specific tier is being provided, who registers it, and by when. A bid with a tier name and the registration path in writing is a stronger paper than one with a bigger year number alone.
Why does the analyzer mark my total “Not comparable” when the price looks reasonable?
Not comparable is a verdict about the paper, not the price. It means a dimension — removal scope, field material, flashing, ventilation or warranty tier — is still unresolved on this bid, so setting its total against another contractor’s total doesn’t produce a like-for-like answer. Close the open dimensions in writing first; the comparison is only meaningful after that.
What this tool does, and what it does not
It can help you
- See whether the bid prices the job you actually asked for.
- Separate the covering from the removal, the deck, the flashings and the ventilation.
- Name every scope line the paperwork leaves unstated.
- Identify which dimensions must be settled before two totals mean anything side by side.
- Go back to the contractor with specific written questions.
It cannot tell you
- Whether the price is fair, high or a bargain.
- Whether your roof needs replacing. Nobody can establish that without getting on it.
- Whether the contractor will do the work well.
- What is under the old covering until it comes off.
- Anything about an insurance or storm-damage claim. That is a separate subject with separate rules.
Where to go next
- Roof Replacement Cost Calculator — the drivers behind the number, before a bid exists.
- Roof replacement quote checklist — this framework written out in full.
- What really drives a roof replacement price.
- Ice and water shield roof quote decoder — where the membrane goes, how far, and when two bids stop being comparable.
- Roofing warranties explained — what the warranty lines actually mean.
- All roofing guides and how we estimate costs.
About the author
About UpgradeWorth Editorial. UpgradeWorth Editorial researches window, door and roofing costs for U.S. homeowners using manufacturer documents, public pricing data and homeowner quotes shared in public forums. We don’t sell products or take contractor fees, and we haven’t installed or lab-tested the products we cover. Spot an error? Contact us.