Before you sign
Roofing Bid Checklist
Each unticked line is a question to ask before you sign. Amber items mean totals are not comparable until both bids answer them.
How to use: Print → tick only written lines → email unticked items → rebid on same removal scope → run the Roof Quote Analyzer.
A. Job definition
- Area in squares/sq ft + measure method (on-roof / ground / satellite)
- Pitch, stories, complexity acknowledged
- Sections included; detached structures named
- Flat/low-slope sections addressed or excluded
B. Tear-off, layers, disposal
- Tear-off vs overlay explicit
- Layer count stated — or assumption + price if wrong
- Disposal/dumpster included, excluded, or allowance
C. Deck and hidden layers
- Deck inspection after tear-off
- Decking allowance: # sheets + $/sheet beyond
- Underlayment type named
- Ice & water barrier locations
- Flashing policy (new vs reuse; pieces named)
- Penetration boots with count
- Skylights: replace / reflash / exclude
D. Visible system and ventilation
- Manufacturer + product line + color
- Hip/ridge: manufactured vs cut-up
- Nailing / wind install pattern
- Accessory system for warranty tier
- Exhaust + intake ventilation plan
E. Warranty and paperwork
- Manufacturer warranty tier + registration party/deadline
- Workmanship warranty years + who backs it
- Permit party; licence #; insurance evidence
- Exclusions, change-order rule, payment schedule
F. Scope detail — penetrations, flashing, ventilation
For each line, mark the status the bid actually gives — Included, Excluded, or Unclear — then write what the contractor says on the Notes line. Any line that stays Unclear belongs in your rebid email.
1. Pipe penetrations
-
Ask whether every penetration (plumbing stacks, kitchen and bath vents, electrical masts, HVAC flues) is listed by count and type, not left as a lump sum.
-
Ask whether each boot or pipe-flashing assembly will be replaced new, repaired, or reused as-is — and which pipes get which treatment.
-
Ask whether specialty collars (lead sleeves for cast-iron stacks, high-temperature flue flashing) are called out separately rather than assumed under “boots”.
2. Wall intersections and flashing
-
Ask whether step flashing at every roof-to-wall intersection will be replaced new or reused, and who is responsible if hidden damage is found behind the siding during tear-off.
-
Ask whether kickout flashing is installed where a roof edge meets a wall above a gutter, or excluded with a stated reason — not left to a general “as needed”.
-
Ask whether chimney, dormer, and sidewall flashing are itemized separately with their replace-or-reuse status, rather than grouped under a single “flashing” line.
3. Ventilation scope
-
Ask whether the existing intake (soffit, edge, drip-edge, or gable) and exhaust (ridge, box, turbine, or powered) are documented on the bid, including anything the contractor already sees as undersized or blocked.
-
Ask whether the proposed intake and exhaust approach is written down — including how any mixed exhaust types (for example a new ridge vent above existing box or powered vents) will be handled.
-
Ask whether bath-fan or dryer vents that currently terminate in the attic (if any) are called out as a scope item, so they are not discovered mid-tear-off as a change order.
Not comparable until
- Tear-off vs overlay differs or unspecified
- Layer count or area basis unreconciled
- Product line unnamed (“architectural” alone)
- Decking “as needed” with no unit price
- Ventilation plan omitted
- Flashing “seal as needed” with no policy
- One bid excludes skylights/flat sections the other includes
- Pipe penetrations not itemized by count, type and boot/collar treatment (see F.1)
- Mixed exhaust types (ridge over box or powered) left unresolved (see F.3)
Print tip: Browser Print → Save as PDF. Never labels bids fair or a rip-off.